跳至主要内容

博文

目前显示的是标签为“solids control”的博文

Linear Motion Shale Shaker Function and Application

Linear motion shale shaker  is  the  first stage  solids control equipment in drilling fluid   processing system, well  known as solids treating  equipment in solids control system . Linear motion shale shaker  decides the performance of the whole solids control system . Linear motion shale shaker  for solids control system   remove s  dril l  cuttings from drilling fluid during   mud circulat ion  and drilling.  Controlling the solids in drilling fluid is important to control  drilling  cost and protect environment. Linear m otion s hale s haker s typically consist of wire mesh shaker screens in  various mesh sizes that shake or vibrate the drill cuttings  which across and off the screens as the drilling fluid or drilling mud flows through shaker screen  and back into the drilling mud  system. This separates the solid drill cuttings from the fluid so that it can be recirculated back down the wellbore  for continuous well drilling . In oilfield industry, linear motion s hale

Solids Control Equipment Application in Drilling Waste Management

Drilling waste is unavoidable consequence during  drilling operations. If the  drilling fluid  does not carry cuttings and cavings to the surface, the rig either is not “making hole” or soon will be stuck in the hole it is making. The drill ing   waste  that are separated from the drilling fluid on the surface by the s olids  control equipment  and some quantity of unrecoverable or economically unwanted drilling fluid are a major source of drilling waste. Drilled and formation solids that are sized smaller than can be removed by s olids  control equipment are often reported as drill solids. Some quantity of drill solids will accumulate in the drilling fluid and must be removed by the s olids  control equipment or reduced in concentration by dilution . Before the introduction of mechanical solids   removal equipment, dilution was used to control solids content in the drilling waste management . The typical dilution procedure calls for dumping a portion of the active drilling